Heritage Trail Project
 
 
Status:
Closed
Posted Date:
9/4/2019
Closing Date:
9/25/2019 5:00 PM
 
 
More Information:
 
 
The Town of Matthews seeks bids from qualified, experienced trail builders to design and construct a combined natural / paved surface trail, creating the described Heritage Trail.  Maps and descriptions of the proposed alignment and trail area are available for download.

The Heritage Trail project extends approximately 7,000’ in length, connecting Matthews Town Hall, the historic Crestdale Community and Four Mile Creek Greenway in Matthews.  Approximately 3500’ of existing sidewalk and roadway will be incorporated along with approximately 3500’ of constructed trail surfacing.  Ideal trail width will be 12’ in most areas (10’ trail, 1’ shoulder on each side).  Site constraints will reduce the width in some areas. Minor grading is needed for the entire length of constructed trail.  Selective tree and vegetation removal is needed in identified areas.  In effort to preserve trees, some sections of trail construction may include a design-build element to install the trail in heavily wooded areas.

Contact Corey King for more information

Corey King, Director
[email protected]
704-708-1263

Download the complete bid package   HERE  and additional detail on the Swale Bridge  HERE

BID PROPOSAL DOCUMENT REVIEW SCHEDULE

Bidder Questions Due:  5:00PM, September 13, 2019

Bid Submission Deadline: 5:00PM, September 25, 2019

Public Bid Opening: 10:00 AM, October 2, 2019, Matthews Community Center, 100 McDowell St., Matthews, NC 28105

 


Town of Matthews, North Carolina

CONTACT US

Town of Matthews
232 Matthews Station St.
Matthews, NC 28105

Phone (704) 847-4411
Fax (704) 845-1964

CONTACT LINKS

Report a Concern
Staff Directory
Facilities


Government Websites by MunicipalCMS

Facebook Twitter YouTube  0