Heritage Trail Project
The Town of Matthews seeks bids from qualified, experienced trail builders to design and construct a combined natural / paved surface trail, creating the described Heritage Trail.  Maps and descriptions of the proposed alignment and trail area are available for download.

The Heritage Trail project extends approximately 7,000’ in length, connecting Matthews Town Hall, the historic Crestdale Community and Four Mile Creek Greenway in Matthews.  Approximately 3500’ of existing sidewalk and roadway will be incorporated along with approximately 3500’ of constructed trail surfacing.  Ideal trail width will be 12’ in most areas (10’ trail, 1’ shoulder on each side).  Site constraints will reduce the width in some areas. Minor grading is needed for the entire length of constructed trail.  Selective tree and vegetation removal is needed in identified areas.  In effort to preserve trees, some sections of trail construction may include a design-build element to install the trail in heavily wooded areas.

Contact Corey King for more information

Corey King, Director
[email protected]
704-708-1263

Download the complete bid package  HERE

BID PROPOSAL DOCUMENT REVIEW SCHEDULE

Bidder Questions Due:  5:00PM, September 13, 2019

Bid Submission Deadline: 5:00PM, September 25, 2019

Public Bid Opening: 10:00 AM, October 2, 2019, Matthews Community Center, 100 McDowell St., Matthews, NC 28105


  

       
       
       


      Town of Matthews, North Carolina

      CONTACT US

      Town of Matthews
      232 Matthews Station St.
      Matthews, NC 28105

      Phone (704) 847-4411
      Fax (704) 845-1964

      CONTACT LINKS

      Report a Concern
      Staff Directory
      Facilities


      Government Websites by MunicipalCMS

      Facebook Twitter YouTube  0